South Kyle - Project planning submission

This page includes the project planning submission as well as non-technical summary, environmental statement, technical appendices, 3D model figures among other things. Read more in the documents below. 

1. Planning Statement

Planning-Statement-130806-(A4).pdf

2. Volume 1 - Non Technical Summary

NTS-Fig-1-Site-Location.pdf
NTS-Fig-2-Site-Layout.pdf
NTS-Preface.pdf
South-Kyle-Non-Technical-Summary_PrintVersion2.pdf

3. Volume 2 - Environmental Statement

4. Volume 3 - Figures

0.1---Coordinates.pdf
00---List-of-Figures.pdf
Fig-1.1-Site-Location.pdf
Fig-1.2-Application-Boundary.pdf
Fig-10.1-Designated-Historic-Assets.pdf
Fig-10.2-Non-Designated-Historic-Assets.pdf
Fig-10.3-Non-Designated-Historic-Assets-within-the-Site-Boundary.pdf
Fig-10.4-Craigengillan-and-Dalmellington-Designed-Historic-Assets.pdf
Fig-11.10A-Breeding-Birds-2009-(North-East).pdf
Fig-11.10B-Breeding-Birds-2009-(South-East).pdf
Fig-11.10C-Breeding-Birds-2009-(South-West).pdf
Fig-11.10D-Breeding-Birds-2009-(North-West).pdf
Fig-11.11-Breeding-Birds-2010.pdf
Fig-11.12A-Breeding-Birds-2012-(North-East).pdf
Fig-11.12B-Breeding-Birds-2012-(South-East).pdf
Fig-11.12C-Breeding-Birds-2012-(South-West).pdf
Fig-11.12D-Breeding-Birds-2012-(North-West).pdf
Fig-11.13-Winter-Walkover-Results-2011-2012.pdf
Fig-11.14-Black-Grouse-Survey-1997-2012.pdf
Fig-11.15-Non-Confidential-Breeding-Raptor-Results.pdf
Fig-11.1A-Survey-Areas-and-Vantage-Point-Locations.pdf
Fig-11.1B-Survey-Areas-and-Vantage-Point-Locations.pdf
Fig-11.2-Flight-Activity-by-Target-Species-(Summer-2009).pdf
Fig-11.3-Flight-Activity-by-Secondary-Species-(Summer-2009).pdf
Fig-11.4-Flight-Activity-by-Target-Species-(Summer-2010).pdf
Fig-11.5-Flight-Activity-by-Secondary-Species-(Summer-2010).pdf
Fig-11.6-Flight-Activity-by-Target-Species-(Summer-2012).pdf
Fig-11.7-Flight-Activity-by-Secondary-Species-(Summer-2012).pdf
Fig-11.8-Flight-Activity-by-Target-Species-(Winter-11-12).pdf
Fig-11.9-Flight-Activity-by-Secondary-Species-(Winter-11-12).pdf
Fig-12.1-Ecological-Survey-Areas.pdf
Fig-12.2-Bat-Activity-Transect-Locations.pdf
Fig-12.3-Designated-Sites.pdf
Fig-12.4-Phase-1-Habitats.pdf
Fig-12.5A-Phase-1-Habitats_NVC-Code-(North-East).pdf
Fig-12.5B-Phase-1-Habitats_NVC-Code-(South-East).pdf
Fig-12.5C-Phase-1-Habitats_NVC-Code-(South-West).pdf
Fig-12.5D-Phase-1-Habitats_NVC-Code-(North-West).pdf
Fig-12.6A-Protected-Species-2012-(North).pdf
Fig-12.6B-Protected-Species-2012-(South).pdf
Fig-12.7-Bat-Activity.pdf
Fig-12.8-Red-Squirrel-Habitat.pdf
Fig-12.9-Proposed-HMP-Areas.pdf
Fig-13.1-Abundance-of-Juvinile-Salmon-and-Trout-from-the-2006-and-2011-Surveys.pdf
Fig-13.2-Summary-of-Invertebrate-Data-from-the-2006-and-2011-Surveys.pdf
Fig-14.1-Groundwater-Vulnerability-(2).pdf
Fig-14.2-Regional-Hydrology-(2).pdf
Fig-14.3-Local-Hydrology.pdf
Fig-14.4-Potential-Groundwater-Dependent-Terrestrial-Ecosystems.pdf
Fig-14.5-Typical-Watercourse-Crossings.pdf
Fig-15.1-Peat-Depth-Contour-Map.pdf
Fig-15.2-Drift-Geology.pdf
Fig-15.3-Solid-Geology.pdf
Fig-17.1-Noise-SKyle_Operational.pdf
Fig-17.2-Noise-SKyle_Operational_Consented.pdf
Fig-17.3-Noise-SKyle_Operational_Consented_Proposed.pdf
Fig-18.1-Properties-Affected-By-Shadow-Flicker.pdf
Fig-3.1-TechnicalConstraints.pdf
Fig-3.2-EnvironmentalConstraints.pdf
Fig-3.3-Design-Evolution.pdf
Fig-4.1-Designations_30km.pdf
Fig-4.10-Temporary-Compund_TC2.pdf
Fig-4.11-Indicative-Temporary-Storage-Area_TSA1_TSA2.pdf
Fig-4.12-Substation-Compound.pdf
Fig-4.13-Permanent-Welfare-Facility.pdf
Fig-4.14-Wind-Farm-Connection-Compound.pdf
Fig-4.2-Site-Layout.pdf
Fig-4.3Typical-Wind-Turbine.pdf
Fig-4.4-Typical-Wind-Turbine-Foundation.pdf
Fig-4.5-Indicative-Crane-Hardstanding-Arrangement.pdf
Fig-4.6a-Meikle-Hill-Site-Entrance-B741.pdf
Fig-4.6b-Brownhills-Site-Entrance-A713.pdf
Fig-4.7-Site-Roads_Watercourse-Crossings.pdf
Fig-4.8-Typical-Free-Standing-Lattice-Monitoring-Mast.pdf
Fig-4.9a-Temporary-Compund-Plan_TC1_TC3.pdf
Fig-4.9b-Temporary-Compound-Plan-Batching-Plant.pdf
Fig-6.1-Indicative-Floating-Road-Design.pdf
Fig-6.10a-Site-Access-Road-Entrance-A713.pdf
Fig-6.10b-Site-Access-Road-Entrance-B741.pdf
Fig-6.2-Indicative-Excavated-Road-Design.pdf
Fig-6.3-Indicative-Upgraded-Road-Design.pdf
Fig-6.4-Indicative-Rockfilled-Road.pdf
Fig-6.5-Typical-Cable-Trench-Design.pdf
Fig-6.6-Typical-Circular_Pipe_Culvert.pdf
Fig-6.7-Typical-Box-Culvert.pdf
Fig-6.8-Armco-Arch.pdf
Fig-6.9-Typical-Bridge.pdf
Fig-7.1-TransportRoutes.pdf
Fig-8.1-Forest-Locations.pdf
Fig-8.2-Current-Stocking-PLYR.pdf
Fig-8.3-Current-Stocking-SPIS.pdf
Fig-8.4-Existing-Fell-Plan.pdf
Fig-8.5-Existing-Restock-Plan.pdf
Fig-8.6-Wind-Farm-Fell-Plan.pdf
Fig-8.7-Combined-Fell-Plan-Existing_WF.pdf
Fig-8.8-Tree-Maturity-2018.pdf
Fig-8.9-Combined-Restock-Plan-Existing_WF.pdf

5. Volume 4 - LVIA

0---List-of-Figures.pdf
Fig-9.1-Site-Location.pdf
Fig-9.10-Cumulative-Sites.pdf
Fig-9.11.1-ZTV_Cumulative.pdf
Fig-9.11.2-ZTV_Cumulative_A1.pdf
Fig-9.12.1-ZTV_Turbines_Constructed-Consented.pdf
Fig-9.12.2-ZTV_Turbines_Proposed.pdf
Fig-9.12.3-ZTV_Sites_Constructed-Consented.pdf
Fig-9.12.4-ZTV_Sites_Proposed.pdf
Fig-9.13.1-VP01_CumulativeWireframe.pdf
Fig-9.13.10-VP05_CumulativePhotomontage.pdf
Fig-9.13.11-VP08_CumulativeWireframeLeft.pdf
Fig-9.13.11-VP08_CumulativeWireframeRight.pdf
Fig-9.13.12-VP08_CumulativePhotomontageLeft.pdf
Fig-9.13.12-VP08_CumulativePhotomontageRight.pdf
Fig-9.13.13-VP14_CumulativeWireframeLeft.pdf
Fig-9.13.13-VP14_CumulativeWireframeRight.pdf
Fig-9.13.14-VP14_CumulativePhotomontageLeft.pdf
Fig-9.13.14-VP14_CumulativePhotomontageRight.pdf
Fig-9.13.15-VP16_CumulativeWireframeLeft.pdf
Fig-9.13.15-VP16_CumulativeWireframeRight.pdf
Fig-9.13.16-VP16_CumulativePhotomontageLeft.pdf
Fig-9.13.16-VP16_CumulativePhotomontageRight.pdf
Fig-9.13.17-VP19_CumulativeWireframe.pdf
Fig-9.13.18-VP19_CumulativePhotomontage.pdf
Fig-9.13.19-VP28_CumulativeWireframeLeft.pdf
Fig-9.13.19-VP28_CumulativeWireframeRight.pdf
Fig-9.13.2-VP01_CumulativePhotomontage.pdf
Fig-9.13.20-VP28_CumulativePhotomontageLeft.pdf
Fig-9.13.20-VP28_CumulativePhotomontageRight.pdf
Fig-9.13.3-VP02_CumulativeWireframe.pdf
Fig-9.13.4-VP02_CumulativePhotomontage.pdf
Fig-9.13.5-VP03_CumulativeWireframe.pdf
Fig-9.13.6-VP03_CumulativePhotomontage.pdf
Fig-9.13.7-VP04_CumulativeWireframe.pdf
Fig-9.13.8-VP04_CumulativePhotomontage.pdf
Fig-9.13.9-VP05_CumulativeWireframe.pdf
Fig-9.14-Roads-Location-Plan.pdf
Fig-9.15.1-Visibility-of-Wind-Farms_A713_Operational-Consented.pdf
Fig-9.15.2-Visibility-of-Wind-Farms_A713_in-Application.pdf
Fig-9.15.3-Visibility-of-Wind-Farms_B741_Operational-Consented.pdf
Fig-9.15.4-Visibility-of-Wind-Farms_B741_in-Application.pdf
Fig-9.15.5-Visibility-of-Wind-Farms_Loch-Doon_Operational-Consented.pdf
Fig-9.15.6-Visibility-of-Wind-Farms_Loch-Doon_in-Application.pdf
Fig-9.16-Open-Cast-Mine-Sites.pdf
Fig-9.17.1-ZTV_Bareground_OpenCastMines_A1.pdf
Fig-9.17.2-ZTV_Bareground_OpenCastMines_2_A1.pdf
Fig-9.2-Landscape-Designations.pdf
Fig-9.2.2-Paths_Tracks.pdf
Fig-9.3-Landscape-Character-Assessment.pdf
Fig-9.4.1-Landform_Viewpoint-Locations.pdf
Fig-9.4.2-L_V-Dalmellington_Craigengillan.pdf
Fig-9.5.1-ZTV_Bareground.pdf
Fig-9.5.10-Visibility-Blade-Tip_within-Paths_Tracks.pdf
Fig-9.5.2-ZTV_Bareground_A1.pdf
Fig-9.5.3-ZTV_Bareground_Detailed_A1.pdf
Fig-9.5.4-ZTV_Bareground_Viewpoints.pdf
Fig-9.5.5-ZTV_Bareground_Viewpoints_2.pdf
Fig-9.5.6-ZTV_Bare-Detail_Dalmellington_Craigengillan_A1.pdf
Fig-9.5.7-Visibility-Blade-Tip_within-Landscape-Designations.pdf
Fig-9.5.8-Visibility-Blade-Tip_within-Landscape-Character.pdf
Fig-9.5.9-ZTV-Turbine-Numbers.pdf
Fig-9.6.1-ZTV_Obstructions.pdf
Fig-9.6.2-ZTV_Obstructions_A1.pdf
Fig-9.6.3-ZTV_Obstructions_Detailed_A1.pdf
Fig-9.6.4-ZTV_Obstuctions_Viewpoints.pdf
Fig-9.6.5-ZTV_Obstructions_Viewpoints_2.pdf
Fig-9.6.6-ZTV_Obs-Detail_Dalmellington_Craigengillan_A1.pdf
Fig-9.7.1-WF_Vwp1_A77-West-of-Maybole.pdf
Fig-9.7.10-PM_Vwp5_B743-Muirkirk-to-Sorn.pdf
Fig-9.7.11-WF_Vwp6_Southern-Upland-Way_East-Sanquhar.pdf
Fig-9.7.12-WF_Vwp7_Footpath-s.e-of-St-Johns-Town-of-Dalry.pdf
Fig-9.7.13-WF_Vwp8_Rhinns-of-Kells_Corserine.pdf
Fig-9.7.14-PM_Vwp8_Rhinns-of-Kells_Corserine.pdf
Fig-9.7.15-WF_Vwp9_Merrick-Summit.pdf
Fig-9.7.16-PM_Vwp9_Merrick-Summit.pdf
Fig-9.7.17-WF_Vwp10_A70-Cumnock.pdf
Fig-9.7.18-PM_Vwp10_A70-Cumnock.pdf
Fig-9.7.19-WF_Vwp11_New-Cumnock.pdf
Fig-9.7.2-PM_Vwp1_A77-West-of-Maybole.pdf
Fig-9.7.20-PM_Vwp11_New-Cumnock.pdf
Fig-9.7.21-WF_Vwp12_B741-Bankglen.pdf
Fig-9.7.22-PM_Vwp12_B741-Bankglen.pdf
Fig-9.7.23-WF_Vwp13_B741-Dalleagles.pdf
Fig-9.7.24-PM_Vwp13_B741-Dalleagles.pdf
Fig-9.7.25-WF_Vwp14_Blackcraig-Hill.pdf
Fig-9.7.26-PM_Vwp14_Blackcraig-Hill.pdf
Fig-9.7.27-WF_Vwp15_Black-Hill-Southern-Upland-Way.pdf
Fig-9.7.28-WF_Vwp16_Cairnsmore-or-Carsphairn.pdf
Fig-9.7.29-PM_Vwp16_Cairnsmore-or-Carsphairn.pdf
Fig-9.7.3-WF_Vwp2_Carrick-Hills.pdf
Fig-9.7.30-WF_Vwp17_A713-at-Carsphairn.pdf
Fig-9.7.31-WF_Vwp18_North-of-Loch-Doon-Castle.pdf
Fig-9.7.32-PM_Vwp18_North-of-Loch-Doon-Castle.pdf
Fig-9.7.33-WF_Vwp19_South-of-Beoch-House-Loch-Doon.pdf
Fig-9.7.34-PM_Vwp19_South-of-Beoch-House-Loch-Doon.pdf
Fig-9.7.35-WF_Vwp20_Footpath-East-of-Ness-Glen.pdf
Fig-9.7.36-PM_Vwp20_Footpath-East-of-Ness-Glen.pdf
Fig-9.7.37-WF_Vwp21_C.E-Dark-Sky-Observatory.pdf
Fig-9.7.38-PM_Vwp21_C.E-Dark-Sky-Observatory.pdf
Fig-9.7.39-WF_Vwp22_C.E-The-Fort.pdf
Fig-9.7.40-WF_Vwp23_C.H-Stables.pdf
Fig-9.7.41-PM_Vwp23_C.H-Stables.pdf
Fig-9.7.42-WF_Vwp24_C.H-Front-Door.pdf
Fig-9.7.43-PM_Vwp24_C.H-Front-Door.pdf
Fig-9.7.44-WF_Vwp25_Former-Summerhouse-at-Craigengillan.pdf
Fig-9.7.45-WF_Vwp26_Berbeth.pdf
Fig-9.7.46-WF_Vwp27_Dalcairnie-Glen.pdf
Fig-9.7.47-PM_Vwp27_Dalcairnie-Glen.pdf
Fig-9.7.48-WF_Vwp28_Auchenroy-Hill.pdf
Fig-9.7.49-PM_Vwp28_Auchenroy-Hill.pdf
Fig-9.7.4_PM_Vwp2_Carrick-Hills.pdf
Fig-9.7.5-WF_Vwp3_B743-South-of-Tarbolton.pdf
Fig-9.7.50-WF_Vwp29_Dalnean-Hill.pdf
Fig-9.7.51-WF_Vwp30_B741-West-of-Dalmellington.pdf
Fig-9.7.52-PM_Vwp30_B741-West-of-Dalmellington.pdf
Fig-9.7.53-WF_Vwp31_Bogton-Loch---East-of-Road-to-Dalcainey.pdf
Fig-9.7.54-PM_Vwp31_Bogton-Loch---East-of-Road-to-Dalcainey.pdf
Fig-9.7.55-WF_Vwp32_A713-West-of-Dalmellington.pdf
Fig-9.7.56-PM_Vwp32_A713-West-of-Dalmellington.pdf
Fig-9.7.57-WF_Vwp33_Dalmellington-Church.pdf
Fig-9.7.58-WF_Vwp34_Bellsbank-South-of-Dalmellington.pdf
Fig-9.7.59-WF_Vwp35_Picnic-Area-off-A713.pdf
Fig-9.7.6-PM_Vwp3_B743-South-of-Tarbolton.pdf
Fig-9.7.7-WF_Vwp4_Station-Road-Mauchline.pdf
Fig-9.7.8-PM_Vwp4_Station-Road-Mauchline.pdf
Fig-9.7.9-WF_Vwp5_B743-Muirkirk-to-Sorn.pdf
Fig-9.8-Residential-Amenity-Location.pdf
Fig-9.9-Cumulative-Sites_60km.pdf

7. PACC Report

1-South-Kyle-PACC-Report.pdf
10-Appendix-5-Marketing-Colateral.pdf
11-Appendix-6-Respondents'-Written-Comments.pdf
12-Appendix-7-Suggestions-for-Community-Benefit.pdf
13-Appendix-8-SP=EED-Audit.pdf
6-Appendix-1-Public-Consultation.pdf
7-Appendix-2-Dalmellinton-CC-Meeting-Notes.pdf

8. South Kyle 3D Model

3D-Model-Readme.pdf
South-Kyle-v8-08-03-13.exe

3. Volume 2 - Environmental Statement/Volume 2 - Environmental Statement - Part 1

0-Preface-and-Contents-130806-(A4).pdf
01-Introduction-130821.pdf
02-Legal-&-Policy-Framework-130806-(A4).pdf
03-Site-Selection-130806-(A4).pdf
04-Description-of-the-proposal-130806-(A4).pdf
05-Scoping-and-Public-Consultation-130806-(A4).pdf
06-Construction-130806-(A4).pdf
07-Access,-Traffic-&-Transport-130806-(A4).pdf
08-Forestry-130806-(A4).pdf
09-LVIA-130821.pdf
10-Archaeology-and-Cultural-Heritage-130806-(A4).pdf
11-Ornithology-130807-(A4).pdf

3. Volume 2 - Environmental Statement/Volume 2 - Environmental Statement - Part 2

00-Contents-130806-(A4).pdf
12-Ecology-130807-(A4).pdf
13-Fisheries-130806-(A4).pdf
14-Hydrology-130806-(A4).pdf
15-Peat-130806-(A4).pdf
16-Socio-Economic-130806-(A4).pdf
17-Noise-130806-(A4).pdf
18-Shadow-Flicker-130806-(A4).pdf
19-Aviation-130806-(A4).pdf
20-Safety-130806-(A4).pdf
21-Monitoring-130806-(A4).pdf
22-References-130807-(A4).pdf

6. Volume 5 - Technical Appendices/APP05 SCOPING CONSULTATION

Appendix-5.1.pdf
Appendix-5.2.pdf
Appendix-5.3.pdf

6.Volume 5 - Technical Appendices/APP06 CONSTRUCTION

Appendix-6.1---Preliminary-Borrow-Pit-Assessmentv2.0.pdf
Appendix-6.2---Borrow-Pit-Design-SLR121031.pdf

6. Volume 5 - Technical Appendices/APP07 ACCESS TRAFFIC TRANSPORT

Appendix-7.1---Transport-Assessment-Report.pdf
Appendix-7.1_Annex-A---Traffic-Count-Data.pdf
Appendix-7.1_Annex-B---Accident-data_130723.pdf
Appendix-7.1_Annex-C---Construction-Traffic-Forecast.pdf
Appendix-7.1_Annex-D---Abnormal-Load-Route-Report.pdf
Appendix-7.1_Annex-E---Traffic-Management-Plan.pdf

6. Volume 5 - Technical Appendices/APP09 LANDSCAPE

Appendix-9.1---Landscape-and-Visual-Assessment-Methodology.pdf
Appendix-9.2---Preparation-of-LVIA.pdf

6. Volume 5 - Technical Appendices/APP10 ARCHEOLOGY

Appendix-10.1---Archaeology-and-Cultural-Heritage---Technical-Report.pdf

6. Volume 5 - Technical Appendices/APP11 ORNITHOLOGY

Appendix-11.1---Fig-11.1.1---Vantage-Point-Locations-and-Viewsheds-(2009---12).pdf
Appendix-11.1---Fig-11.1.2---Observation-Effort-(Summer-2009).pdf
Appendix-11.1---Fig-11.1.3---Observation-Effort-(Summer-2010).pdf
Appendix-11.1---Fig-11.1.4---Observation-Effort-(Winter-2011---12).pdf
Appendix-11.1---Fig-11.1.5---Observation-Effort-(Summer-2012).pdf
Appendix-11.1---Ornithology-Technical-Appendix.pdf
Appendix-11.2---Ornithology-Technical-Appendix-Forestry-Calculations.pdf

6. Volume 5 - Technical Appendices/APP12 ECOLOGY

Appendix-12-Ecology-and-Protected-Species---Cover-Page.pdf
Appendix-12.1---Summary-of-Relevant-Nature-Conservation-Policies.pdf
Appendix-12.2---Desk-Study-Findings.pdf
Appendix-12.3---Habitat-and-Protected-Fauna-Survey-Methods.pdf
Appendix-12.4---Habitat-Survey-Target-Notes.pdf
Appendix-12.5---NVC-Quadrat-Data.pdf
Appendix-12.6---Plant-Species-List.pdf
Appendix-12.7---Protected-Species-Survey-Findings.pdf
Appendix-12.8---Results-of-the-Bat-Surveys.pdf
Appendix-12.9---Calculations-of-Habitat-Loss.pdf

6. Volume 5 - Technical Appendices/APP13 FISHERIES

Appendix-13-Fish-Populations-and-Fisheries---Cover-Page.pdf
Appendix-13.1---Impacts-and-Mitigation-Table.pdf
Appendix-13.2---Baseline-Report.pdf

6. Volume 5 - Technical Appendices/APP14 HYDROLOGY

03640.00004.12.WOD-1.0.Hydraulic_Reach.pdf
03640.00004.12.WOD-2.0.Cross_Sections.pdf
Appendix-14.1---Identification-of-Potential-Effects.pdf
Appendix-14.2---Local-SEPA-Surface-Water-Quality-Monitoring.pdf
Appendix-14.3---Watercourse-Crossing-Details.pdf
Appendix-14.4---DrawingWOD-3.0.Schematic_Crossings.pdf
Appendix-14.4---Water-of-Deugh-Assessment.pdf

6. Volume 5 - Technical Appendices/APP15 PEAT GEOLOGY

Appendix-15.1---PSRA-Factual-Report/
Appendix-15.2---PSRA-Interpretive-Report/
Appendix-15.3---Scottish-Government-Windfarm-Carbon-Assessment-Tool-Version-2.7.0/
Appendix-15.4---Peat-Spoil-Blalance-Calculations/

6. Volume 5 - Technical Appendices/APP17 NOISE

Appendix-17.1---17.4.pdf

6. Volume 5 - Technical Appendices/APP19 AVIATION RADAR EMI

Appendix-19-Aviation---Cover-Page.pdf
Appendix-19.1---Letter-of-Co-operation-(Glasgow-Prestwick-Airport).pdf
Appendix-19.2---IR-Lighting-Study.pdf

6. Volume 5 - Technical Appendices/APP09 LANDSCAPE/Appendix 9.3 - Additional Wireframes

Fig09-18-A1_VPA1_Wireframe.pdf
Fig09-18-A2_VPA2_Wireframe.pdf
Fig09-18-A3_VPA3_Wireframe.pdf
Fig09-18-A4_VPA4_Wireframe.pdf
Fig09-18-A5_VPA5_Wireframe.pdf
Fig09-18-A6_VPA6_Wireframe.pdf
Fig09-18-A7_VPA7_Wireframe.pdf

6. Volume 5 - Technical Appendices/APP10 ARCHEOLOGY/Appendix 10.1 - Wireframes

Cairn-330m-SW-of-The-King's-Cairn-SM1046,-view-NE.pdf
Cairn-330m-SW-of-The-King's-Cairn-SM1046,-view-NNW.pdf
Cairn-Avel,-cairn-800m-S-of-Carsphairn-SM1006.pdf
Holm-of-Daltallochan,-stone-circle-and-standing-stone-SM1029.pdf
Lamford-Burn,-cairn-800m-NE-of-Lamfrod-Bridge-SM1034.pdf
Loch-Doon-Castle-SM90203.pdf
The-King's-Cairn-SM1046,-view-NE.pdf
The-King's-Cairn-SM1046,-view-NNW.pdf
Waterside,-Dalmellington-Ironworks-SM4345.pdf
Woodhead-lead-mines-and-smelter,-Carsphairn-SM5184.pdf

6. Volume 5 - Technical Appendices/APP15 PEAT GEOLOGY/Appendix 15.1 - PSRA Factual Report

Appendix-A-PHRS-paper-for-BWEA28.pdf
Appendix-B-South-Kyle-probe-data.pdf
Appendix-C-Field-data-sheets.pdf
Appendix-Ea-south-kyle-lab.pdf
Appendix-Eb-lab-von-post.pdf
Appendix-Ec-lab-munsell.pdf
SOUTHK~1.PDF

6. Volume 5 - Technical Appendices/APP15 PEAT GEOLOGY/Appendix 15.2 - PSRA Interpretive Report

Appendix-1-South-Kyle-Geotech-Risk-Register-1502121.pdf
Appendix-B-Sheet-1-South-Kyle-WF-5-degrees1.pdf
Appendix-B-Sheet-2-South-Kyle-WF-10-degrees1.pdf
SOUTHK1.PDF

6. Volume 5 - Technical Appendices/APP15 PEAT GEOLOGY/Appendix 15.3 - Scottish Government Windfarm Carbon Assessment Tool Version 2.7.0

SKYLEW1.XLS

6. Volume 5 - Technical Appendices/APP15 PEAT GEOLOGY/Appendix 15.4 - Peat Spoil Blalance Calculations

SKYLEP1.PDF

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.1 - Business Survey List

Appendix-16.1.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.2 - Action Plan Summaries

Appendix-16.2.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.3 - Principal Tourist Routes

Appendix-16.3.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.4 - Principal Walking Routes

Appendix-16.4.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.5 - Core Paths

Appendix-16.5.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.6 - Cycle Routes

Appendix-16.6.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.7 - Recreational Activities

Appendix-16.7.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.8 - Visitor Attractions

Appendix-16.8.pdf

6. Volume 5 - Technical Appendices/APP16 SOCIO ECONOMIC/Appendix 16.9 - Accommodation Providers

Appendix-16.9.pdf

6. Volume 5 - Technical Appendices/APP21 MITIGATION MANAGEMENT MONITORING/App 21.1 - EMP Part 0 - Preface

Appendix-21.1---EMP-0---Preface.pdf

6. Volume 5 - Technical Appendices/APP21 MITIGATION MANAGEMENT MONITORING/App 21.1 - EMP Part 1 - Aim of the EMP

Appendix-21.1---EMP-1---Aim-of-the-EMP.pdf

6. Volume 5 - Technical Appendices/APP21 MITIGATION MANAGEMENT MONITORING/App 21.1 - EMP Part 2 - Briefing Notes

App-21.1---BN-0---Introduction.pdf
App-21.1---BN-1---Infrastructure.pdf
App-21.1---BN-2---Archaeology.pdf
App-21.1---BN-3---Ornithology.pdf
App-21.1---BN-4---Terrestrial-Habitats.pdf
App-21.1---BN-6---Hydrology-and-Hydrogeology.pdf
App-21.1---BN-7---Pollution-Prevention.pdf
App-21.1---BN-8---Transport-and-Traffic.pdf
App-21.1---BN5---Aquatic-Fisheries.pdf

6. Volume 5 - Technical Appendices/APP21 MITIGATION MANAGEMENT MONITORING/App 21.1 - EMP Part 3 - Briefing Notes

Appendix-21.1---EMP-3---Briefing.pdf

6. Volume 5 - Technical Appendices/APP21 MITIGATION MANAGEMENT MONITORING/App 21.1 Annex 1 - OCMS 1 - 19

OCMS---Title-Page.pdf
OCMS-1---Road-and-Wind-Turbine-Construction.pdf
OCMS-10---River-Management.pdf
OCMS-11---Discharge-and-Drainage-Management.pdf
OCMS-12---Waste-Management.pdf
OCMS-13--Traffic-Management.pdf
OCMS-14---Decommissioning.pdf
OCMS-15---Site-Reinstatement.pdf
OCMS-16---Cable-Installation.pdf
OCMS-18---Substation-Installation.pdf
OCMS-19---Health,-Safety-and-Environmental-Management.pdf
OCMS-2---Water-Abstraction.pdf
OCMS-3---Dewatering.pdf
OCMS-4---Construction-on-Peat.pdf
OCMS-5---Borrow-Pits.pdf
OCMS-6---Pollution-Prevention.pdf
OCMS-7---Temporary-Compounds.pdf
OCMS-8---Operation-and-Maintenance.pdf
OCMS-9---Peat-Spoil-Management.pdf

6. Volume 5 - Technical Appendices/APP21 MITIGATION MANAGEMENT MONITORING/App 21.1 Annex 2 - ERIP

Appendix-21.1_Annex-2---EPIRP.pdf

Last updated: 2014-10-20 14:39